Sector | transportation- roads& highways, railways |
Funding Agency | GoN |
Project Location | Rautahat, Sarlahi |
Province | Madhesh |
Project Started Date | February 10, 2023 |
Project Completion Date | July 15, 2023 |
Project Status | Completed Projects |
Clients | Ministry of Physical Infrastructure Development, Madhesh Province |
The Detail Engineering Survey, Design and Report Preparation (DPR) of Madhesh Province, Madheshi Sahid Marg (East- West Highway)” provides the basis for the approval of a project. It shall be a full technical and economic Detail Engineering Survey, Design and Report Preparation (DPR) designed to enable the concerned ministry and the NPC to appraise the project before giving approval. The Proposed Madhesh Province, Madheshi Sahid Marg (East- West Highway)” should passage between Mahendra Rajmarg (East-West Highway) and Postal Highway through almost 48 Local government (Palikas) and its settlements of Madhesh Province. The Total Length of Road is 307.36 Km.
The main objective of the consulting services is to conduct a detail engineering survey of the proposed road, prepare detail design and cost estimate, data collection for social, environmental, safety and design purposes, carry out economic analysis and associated tasks necessary to produce a DPR suitable for guiding the investment from the Province government with Intermediate Lane Standard (i.e. 7.0 m carriage way, 0.6 m clear width line drain, 2 m shoulder on either side on non-settlement area and 0.5 m either side on settlement area) for the construction of the road.
The Road section under the assignment includes:
• Sarlahi to Rautahat Section: 47.130Km (Project Cost: NPR 1,649,370,648.92)
• Rautahat to Bara Section : 26.408 Km (Project Cost: NPR 3,155,483,033.31 )