Sector | transportation- roads& highways, railways |
Funding Agency | GoN |
Project Location | Banke, Surkhet |
Province | Karnali, Lumbini |
Project Started Date | 1 June 2015 |
Project Completion Date | 1 June 2016 |
Project Status | Completed Projects |
Clients | Planning Monitoring and Evaluation Unit, Department of Roads |
Gutu-Bijaura-Lagaam Road, Surkhet (65.28 Km): The proposed road Gutu-Bijaura-Lagaam Road, Surkhet starts at Gutu, Bijaura, Betan, Lagaam, Dansen and ends at Benighat, Surkhet District. The total length of this section is 65.28 km. Total Project Cost is NRs. 3,445.90 million.
Shaigau-Manikpur Road, Banke (21.82 Km): The proposed road Shaigau-Manikpur Road Section, Banke starts at Shaigau, Belbhar, Indrapur, and ends at Manikpur Chowk, Banke District. The total length of this section is 21.82 Km. Total Project Cost is NRs. 638.51 million.
The objectives of the project is to prepare Detailed Project Report of full length of all two Project Road based on detailed design and total cost for construction; preparation of detailed engineering survey and design of Road (excluding bridges), Social and environmental and Economical aspect and develop implementation plan of the Project.