Sector | water resources/irrigation, natural resources, agriculture & food security |
Funding Agency | GoN |
Project Location | Bardiya, Surkhet |
Province | Karnali, Lumbini |
Project Started Date | 1 August 2010 |
Project Completion Date | 1 March 2013 |
Project Status | Completed Projects |
Clients | Mid-western Regional Irrigation Directorate (MWRID), Department of Irrigation |
The targeted irrigation area of BBDP is located in Bardiya and Banke districts of Mid Western Development Region (MWDR). The proposed command area is about 60,502 ha, which comprises four parts.
Part I : About 19,000 ha of the land lying on the left bank of Babai River (Eastern Canal Discharge Capacity 28.5 m3/s)
Part II : About 21,000 ;ha of area lying on the right bank of Babai River, (Western Canal Discharge Capacity 21.0 m3/s)
Part III: About 6,000 ha of land lying on the north of Part I area planed to be irrigated from BBDP. Part IV: About 34,500 ha of land in Banke district planned to be irrigated by Sikta Irrigation Project. (Northern Canal Discharge Capacity 15.0 m3/s)
The objective of this study is to:
• Plan a system of canals that would provide year round irrigation to about 60,502 ha of agriculture land in Banke and Bardia districts so as to enable optimization of water diversion from Bheri to Babai and the resulting power generation.
Carry out field survey and detailed engineering design of the irrigation system to a level sufficient to implement the optimized option of Bheri-Babai diversion project (BBDP). Total Project Cost NRs; 11,039,097,248