Sector | transportation- roads& highways, railways |
Funding Agency | GoN |
Project Location | Baglung, Gulmi, Pyuthan, Rolpa |
Province | Gandaki, Lumbini |
Project Started Date | 1 June 2013 |
Project Completion Date | 1 January 2015 |
Project Status | Completed Projects |
Clients | Planning Monitoring and Evaluation Unit, Department of Roads |
Phulbari Aarthar Dandakharka Rapu Ramjathati Tilahar Dmuwa Road: The proposed road Phulbari to Dmuwa Road Section, Syangja and Parbat starts at Phulbari, Bichar Chautara VDC, Syangja District and ends at Dmuwa Road, Tilahar VDC, Parbat District. The total length of this section is 26.500 km. The section ends at the roadway connection to Pokhara Baglung Highway and thus will provide a better access to the main market places. Total Project Cost is NRs. 665.053 million.
Tamghash Khamsepani Nayagaun Nadi Suryatari Netakharka Purkotdaha Bandikot: The proposed road Tamghash to Bandikot Road Section, Gulmi Pyuthan starts at Tamghash Bazaar, Gulmi District and ends at Bandikot, Pyuthan District. The total length of this section is 37.08 Km. The section ends at the roadway connection Bandikot Road Section and thus will provide a better access to the main market places. Total Project Cost is NRs. 961.193 million.
Sulichaur-Thawang Road: The proposed road Sulichaur-Thawang Road, Rolpa starts at Sulichaur Bazaar, Rolpa District and ends at Thawang Village, Rolpa District. The total length of this section is 51+500 km. Total Project Cost is NRs. 1,539.17 million.
Machhi-Bhimgithhe Road: The proposed road Machhi to Bhimgithhe starts at Machhi Bazaar VDC, Pyuthan District and ends at Bhimgitthe VDC. The total length of this section is 52.8 km. At the starting point of the alignment it crosses Urban road through Machhi bazar and at end it crosses Mid Hill Highway to Burtibang. Total Project Cost is NRs. 2,084.327 million.
The objectives of the project is to prepare Detailed Project Report of full length of all four Project Road based on detailed design and total cost for construction; preparation of detailed engineering survey and design of Road (excluding bridges), Social and environmental aspects, which includes preparation of Resettlement Plan, Environmental Management Plan and Social Development Plan and Economical aspect of Project.