Home / Project / Detailed Engineering Survey, Design and Preparation of Detailed Project Report (DPR) of Roads [(1) Bhalubang Nuwakot Sandhikhark Tamghas Kharbang Sadak (38.41 km), Arghakhanchi; (2) GP Marg, Syangja (Sumrekhola Sirubari Chhaharikhola Limithana, (30.00 Km) Syangja/Parbat; (3) Daring Jagatpur Kega Banethok Dhruba Deurali Bayarghari Sadak, (12.00 Km) Syangja; (4) Sundar Bazar-Rip Maidan Sadak, (15.00 Km) Syangja; (5). Badkhola Thuladihi Moriya Dulegauda Sadak (Syangja Section), (13.59 Kin) Syangja], Contract Package No: PMEU/337335/073/74 DPR-6

Detailed Engineering Survey, Design and Preparation of Detailed Project Report (DPR) of Roads [(1) Bhalubang Nuwakot Sandhikhark Tamghas Kharbang Sadak (38.41 km), Arghakhanchi; (2) GP Marg, Syangja (Sumrekhola Sirubari Chhaharikhola Limithana, (30.00 Km) Syangja/Parbat; (3) Daring Jagatpur Kega Banethok Dhruba Deurali Bayarghari Sadak, (12.00 Km) Syangja; (4) Sundar Bazar-Rip Maidan Sadak, (15.00 Km) Syangja; (5). Badkhola Thuladihi Moriya Dulegauda Sadak (Syangja Section), (13.59 Kin) Syangja], Contract Package No: PMEU/337335/073/74 DPR-6

Detailed Engineering Survey, Design and Preparation of Detailed Project Report (DPR) of Roads [(1) Bhalubang Nuwakot Sandhikhark Tamghas Kharbang Sadak (38.41 km), Arghakhanchi; (2) GP Marg, Syangja (Sumrekhola Sirubari Chhaharikhola Limithana, (30.00 Km) Syangja/Parbat; (3) Daring Jagatpur Kega Banethok Dhruba Deurali Bayarghari Sadak, (12.00 Km) Syangja; (4) Sundar Bazar-Rip Maidan Sadak, (15.00 Km) Syangja; (5). Badkhola Thuladihi Moriya Dulegauda Sadak (Syangja Section), (13.59 Kin) Syangja], Contract Package No: PMEU/337335/073/74 DPR-6

Sector transportation- roads& highways, railways
Funding Agency GoN
Project Location Syangja
Province Gandaki
Project Started Date 1 May, 2017
Project Completion Date 1 May, 2018
Project Status Completed Projects
Clients Planning Monitoring and Evaluation Unit, Department of Roads
Scroll