Sector | transportation- roads& highways, railways |
Funding Agency | GoN |
Project Location | Dhading, Dolakha, Kavrepalanchok, Sarlahi, Sindhuli, Sindhupalchowk |
Province | Bagmati, Madhesh |
Project Started Date | 1 June, 2017 |
Project Completion Date | 1 July, 2018 |
Project Status | Completed Projects |
Clients | Planning Monitoring and Evaluation Unit, Department of Roads |
Detailed Engineering Survey, Design, Preparation of Detailed Project Report (DPR) was carried out for the Project Road (1) Sukute Chapagaun Mildadal Thokarpa Shramthali (15.68Km), Sindhupalchowk, Dolkha, (2) Salyantar Agnichowk Belung Bhanjyang Gumdi Sadak (14.70 Km), Dhading, (3). Thumpakha Ga. Wi. Sha Ko Barha Kilo Timmure Sadak (11.75 Km), Sindhupalchowk, Dolakha, (4) Goltar Kartike Bhadaure Sudhame Sadak (16.00 Km), Sindhuli, (5) Tinpiple Waluwa Boredhobhan Sadak (6.00 Km), Kabhre; (6) Bhaise Mahendra Jyoti Panauti Khopasi Falametar Taldhunga Karmaiya Sadak (44.00 Km), (7). Hariwon Na. Pa. Chakrapath (15.03 Km), Sarlahi. The objectives of the project is to carry out review of existing road and its corridor, detailed engineering survey and design of highway including pavement design and other structures, preparation of contract packages document and preparation of detailed project report (DPR) of mentioned road sections.