Sector | transportation- roads& highways, railways |
Funding Agency | GoN |
Project Location | Parsa |
Province | Madhesh |
Project Started Date | 2/1/2006 |
Project Completion Date | 6/1/2006 |
Project Status | Completed Projects |
Clients | Department of Urban Development and Building Construction |
There is an urgent need to construct a Bypass Road from the Dry-port to Tribhuwan highway to reduce congestion in the core area of Birgunj while transporting goods to and from the Dryport. The Department of Roads/Asian Development Bank (DOR/ADB) has already proposed a 10.8 km long Bypass road to connect dry port with Tribhuwan Highway.
The construction of the road through the conventional land acquisition method not only requires a huge government fund, but also displaces many families thus creating social problem. Therefore, participatory Land Pooling technique is deemed more attractive to acquire both road space and develop the entire corridor with neighborhood level infrastructure, thus benefiting a large number of local residents.
In this context the present study has been carried out to examine/survey major physical, social and economic variables along the proposed road alignment and propose a suitable corridor development plan through the concept of Land Pooling Scheme.