Home / Project / Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of 10 Bridges in Chitwan (Contract No. BB-159-DSD-071/72-25)

Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of 10 Bridges in Chitwan (Contract No. BB-159-DSD-071/72-25)

Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of 10 Bridges in Chitwan (Contract No. BB-159-DSD-071/72-25)

Sector transportation- roads& highways, railways
Funding Agency GoN
Project Location Chitwan
Province Bagmati
Project Started Date 9/1/2015
Project Completion Date 2/1/2018
Project Status Completed Projects
Clients Bridge Unit, Department of Roads
Scroll