Sector | transportation- roads& highways, railways |
Funding Agency | GoN |
Project Location | Sankhuwasabha |
Province | Koshi |
Project Started Date | January 2017 |
Project Completion Date | May 2017 |
Project Status | Completed Projects |
Clients | North-South/ Trade Route Improvement Project Directorate, Department of Roads |
As the road transport is the principal mode of transport in Nepal, the Government of Nepal has given high priority for the construction of roads. Many existing roads lack bridges and it is in this context North-South/ Trade Route Improvement Project Directorate has planned for the Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of the following bridges:
SN
Bridge Name
District
Span Arrangement
Type of Bridge
•
Jor Khola Bridge, Koshi Corridor, Dobhan- Pathibhara-Hatiya Section
Shankhuwashabha
1*20
*RCC, open
Foundation
•
Uwa Khola Bridge, Koshi Corridor, Dobhan-Pathibhara-Hatiya Section
Shankhuwashabha
1*20
*RCC, open
Foundation
•
Uhang Khola Brodge, Koshi Corridor, Dobhan-Pathibhara-Hatiya Section
Shankhuwashabha
1*20
*RCC, open
Foundation
•
Ekuwa Khola Bridge, Koshi Corridor, Dobhan-Pathibhara-Hatiya Section
Shankhuwashabha
1*20
*RCC ,open
Foundation
•
Thado Khola Bridge, Koshi Corridor, Dobhan-Pathibhara-Hatiya Section
Shankhuwashabha
3*20
*RCC, open
Foundation
•
Wang Khola Bridge, Koshi Corridor, Dobhan-Pathibhara-Hatiya Section
Shankhuwashabha
2*25
*RCC, open
Foundation
•
Fakre Khola Brodge, Koshi Corridor, Dobhan-Pathibhara-Hatiya Section
Shankhuwashabha
1*15
*RCC, open
Foundation
•
Barun Khola Bridge, Koshi Corridor, Dobhan-Pathibhara-Hatiya Section
Shankhuwashabha
1*60
*Truss with open Foundation
•
Chang Khola Bridge, Koshi Corridor, Dobhan-Pathibhara-Hatiya Section
Shankhuwashabha
1*15
*RCC, open
Foundation
•
Nang Khola Bridge, Koshi Corridor, Dobhan-Pathibhara-Hatiya Section
Shankhuwashabha
1*15
*RCC, open
Foundation
Geotechnical Investigation: maximum drilling depth of single borehole ??????, total cumulative depth of boreholes ????? (borehole nos. ?????). Total Project cost for 10 bridges ????????????