Sector | transportation- roads& highways, railways |
Funding Agency | GoN |
Project Location | Lalitpur |
Province | Bagmati |
Project Started Date | 10/1/2005 |
Project Completion Date | 12/1/2005 |
Project Status | Completed Projects |
Clients | Department of Urban Development and Building Construction, Division Office, Kathmandu. |
There has been an urgent need to address Kathmandu Valley’s existing Urbanization process and direct its growth in a predetermined and preplanned growth model and not in a haphazardly developed area. Presently, the urban growth has been extended along the adjoining VDCs of the core areas and around the traditional settlements. The existing arterial roads have been serving the rural areas as a prime transportation linkage to core areas however theses roads are of two lanes and inadequate to cater in the current urbanization scenario.
In this regards, the study of major arterial road corridors with the intention of carrying out the improvement of the arterial roads through land development and prepare a proposal for infra-structural development along with land development plan for the whole area has been carried out in this study.