Sector | transportation- roads& highways, railways |
Funding Agency | GoN |
Project Location | Makwanpur, Sindhuli, Sunsari, Udayapur |
Province | Bagmati, Koshi |
Project Started Date | July 2010 |
Project Completion Date | September 2011 |
Project Status | Completed Projects |
Clients | Dharan Chatara Gaighat Katari Sindhuli Hetauda Road Project, Department of Roads |
The road starts from Dharan and ends at Hetauda passing through Chatara, Gaighat, Katari and Sindhuli. It links Central Development Region to Eastern Development Region. Detail Survey and Design work to be carried out for about 300 Km Section of the Project and Detailed project Report to be carried out for the full Project Road Length (Approx. 325 Km). Total Project Cost NRs. 11,209,815,809.05
The objectives of the project is to prepare Detailed Project Report of full length of Project Road based on detailed design and total cost for construction; preparation of detailed engineering survey and design of Road (excluding bridges), Social and environmental aspects, which includes preparation of Resettlement Plan, Environmental Management Plan and Social Development Plan and Economical aspect of Project.