Sector | gis, mapping and information technology, urban development, architecture and other infrastructure, water supply, sanitation, and waste management |
Funding Agency | GoN |
Project Location | Kathmandu |
Province | Bagmati |
Project Started Date | July 2018 |
Project Completion Date | December 2019 |
Project Status | Completed Projects |
Clients | Kathmandu Valley Development Authority |
The Preparation of Detail Project Report for the Development of New Green Town Area around 500.87 ha (10,000 Ropanies) in Northern Part of Kathmandu Valley (Contract No.: KVDA_2073/74_2074/75_8.8.18.867). Project cost NRs. 29.20 billion
Feasibility study of project; Detail Engineering survey work including Drone survey of the area; Social survey of the project area; Collection and preparation of database of the land owners; Digitization (preparation of geo-data base (GIS)) of cadastral map; Preparation of base map in GIS; Preparation of Master Plan in GIS; Design of block planning of 693 hectares (13,623 ropanis) of land area; Detail design of 145.689 km (1.432 million sqm) of urban black topped road (Road width from 50m to 4m including Outer Ring Road); Detail design of intersection and roundabout; Detail design of 268 km long water supply system network; Detail design of 254 km long Storm water pipe network; Detail design of 162 km waste water pipe network; Detail design of river protection work; Detail design of footpath and cycle lane; Environmental Impact Assessment (EIA) of project area; Public consultation and interaction with land/house owner; Preparation of land readjustment policy; The master plan has been prepared on the “Green Infrastructure Planning” concept; Preparation cost estimate; Preparation of Detailed Project Report (DPR); etc.